The site
A wastewater plant is largely underground: tanks, pumping stations and pipes sit deep in the ground. Besides the plant, the project included three village pumping stations and rising mains of 400 m and a twin 768 m line. Everything ran within the main contractor's programme, with the following crews waiting for each structure in turn.
02Our work
We carried out the project's earthworks: excavation for the tanks, buildings and pumping stations, and trenching for the rising mains.
03Scope of work
- Excavation
- Backfilling
- Site grading
- Excavation for tanks and buildings
- Excavation for pumping stations A4, A6, AK
- Trenching for rising mains (400 m and twin 768 m)
The project today
The plant has been operating since 2018, serving Chalkidona and Adendro. The project was funded by the NSRF (ESPA) through the Operational Programme “Transport Infrastructure, Environment and Sustainable Development”.